Wellcome to National Portal
Text size A A A
Color C C C C

সর্ব-শেষ হাল-নাগাদ: ১২ জুন ২০২২

প্রকল্প সমূহের বাস্তবায়িত কার্যক্রম

Total Development activities under various projects of BMDA:

 

 

Development activities

 

 

Achievement

 

Installation of DTW

11461

Activating Inoperable DTW (Nos.)

4332

Installation of LLP (Solar+Electric) (Nos.)

(168+433) = 601

Irrigation Water Distribution System (km.)

12354.40

Extension Irrigation Water Distribution System (km.)

1158.45

Re-excavation of Canals (km.)

2063

Re-excavation of Derelict Ponds (Nos.)

3257

Construction of Cross dam (Nos.)

749

Digging of Dug Well with Solar Energy  (Nos.)

572

Feeder Road Construction (Km.)

1143.71

Drinking water supply from irrigation DTW (Nos.)

1579

Construction of FootOver Bridge (Nos.) 17
Construction of Cattle Cross Culvert (Nos.) 14
Construction of Light Culvert (Nos.) 8

Afforestation (Lakh)

258.86

Farmer training (Person)

151097

 Utilization of Irrigation equipment in 2020-2021 (Nos.)

DTW-15537 + LLP-519

Irrigated area in 2020-2021 (Hec)

5.32

Utilization of Irrigation equipment in 2021-2022(Nos.)

DTW-13044+LLP-259

Irrigated area in 2021-2022 (Hec)

3.74