Total Development activities under various projects of BMDA:
Development activities |
Achievement |
Installation of DTW |
15820 |
Installation of LLP (Solar+Electric) (Nos.) |
(420+546) 966 |
Irrigation Water Distribution System (Km.) |
14043.56 |
Extension Irrigation Water Distribution System (Km.) |
1851.50 |
Re-excavation of Canals (km.) |
2527.82 |
Re-excavation of Derelict Ponds (Nos.) |
4257 |
Construction of Cross dam (Nos.) |
778 |
Digging of Dug Well with solar energy (Nos.) |
640 |
Feeder Road Construction (Km.) |
1144 |
Drinking water supply from irrigation DTW (Nos.) |
1715 |
Construction of Foot over Bridge (Nos.) |
46 |
Construction of Cattle cross culvert (Nos.) |
109 |
Construction of Light Culvert (Nos.) |
8 |
Elimination of water logging (Hec.) |
13057 |
Supply of Hose/Fita Pipe (Meter) |
419100 |
Afforestation (Lakh) |
268.18 |
Farmer training (Person) |
157752 |
Utilization of irrigation equipment in 2022-2023 (Nos.) |
DTW 15490 + LLP 740 |
Irrigated area in 2022-2023 (Lakh Hec) |
Aush 0.40+ Amon 3.34 + Robi 5.76 = 7.50 |
Irrigation charge realization in 2022-2023 (Tk. Lakh) |
22610.27 |
Utilization of irrigation equipment in 2023-2024 (Nos.) |
DTW 15538 + LLP 891 |
Irrigated area in 2023-2024 (Lakh Hec) |
Aush 0.811 + Amon 3.596 + Robi 5.945 |
Irrigation charge realization in 2023-2024 (Tk. Lakh) |
25081.10 |
Cropping intensity (in the command area (before project 117%)) |
240% |